contact us
ADD:Zhujiadang Village Houcheng Jingang Town Zhangjiagang City Jiangsu Province China
MOB:0086-15358890188(Miss Sun)
T EL : 0086-512-58731058
F AX : 0086-512-58731108
MAIL:sue@topelevator.cn
Web :www.top-elevator.cn
www.topelevator.cn
The elevator guide wheel is provided with a pulley structure, the function of which is the function of the pulley block. When the guide wheel is installed, the model frame is arranged on the floor or the bearing beam of the machine room first.
Elevator guide wheel
Elevator guide wheel
The center of gravity of the suspension of a plumb line. In the sides of the plumb line, with guide wheel width spacing, were suspended two auxiliary to the plumb line, three lines for reference, on the traction wheel installation and correction.
1 guide wheel parallel degree to find the right
The guide wheel parallelism is refers to the point of heavy center car center traction wheel and guide wheel on the line should overlap the datum line and bearing beam, a traction wheel, guide wheel positioning in the vertical direction, and guide wheels on both sides of the surface should be parallel with the reference line.
2 guide wheel of the vertical degree to find the positive
The guide wheel plumbdegree is guidance to both sides of a plane wheel should be parallel with the plumb line.
3 technical requirements for the installation of the steering wheel
(1) the deviation of the guide wheel should not be more than 2.0mm.
(2) the parallel error of guide wheel and the traction wheel end surface should be less than lmm.
National Service Hotline:0086-512-58731058
Tel:0086-512-58731058
Fax:0086-512-58731108
mail:sue@topelevator.cn
Add:Zhujiadang Village Houcheng Jingang Town Zhangjiagang City Jiangsu Province China
web:www.top-elevator.cn www.topelevator.cn